Side Discharge Concrete Skip – 300 to 1200L, Forklift or Crane
Price and lead time confirmed with your quote
Prices depend on your forklift and the options you need, so every attachment is quoted individually.
A side discharge concrete skip, also called a cement or concrete hopper, carries concrete, mortar, cement and granular materials from the mixer to the pour by forklift or crane. A large rectangular side gate lets the material out at a controlled rate, and it's easy to clean when the job's done.
The base has 3-way entry with a fork locking system for forklift use, and lateral lifting points for crane use. Open the gate with a lever, a hand wheel or a hydraulic cylinder: all three suit the 300L to 1000L sizes, and the 1200L comes with a hand wheel or hydraulics.
Specifications
| Model | Capacity | Safe working load | Size (L x W x H) | Gate |
|---|---|---|---|---|
| FCH-11033 | 300L | 720kg | 1130 x 860 x 1040mm | Lever, hand wheel or hydraulic |
| FCH-11053 | 500L | 1200kg | 1130 x 860 x 1340mm | Lever, hand wheel or hydraulic |
| FCH-11083 | 800L | 1920kg | 1300 x 995 x 1400mm | Lever, hand wheel or hydraulic |
| FCH-11103 | 1000L | 2400kg | 1300 x 995 x 1600mm | Lever, hand wheel or hydraulic |
| FCH-11123 | 1200L | 2880kg | 1560 x 1120 x 1600mm | Hand wheel or hydraulic |
| Model suffix | FM lever, FMVO hand wheel, FMVH hydraulic |
|---|---|
| Materials | Concrete, mortar, cement and granular materials |
| Discharge | Large rectangular side gate |
| Forklift use | 3-way entry base with fork locking |
| Crane use | Lateral lifting points |
| Standards | UKCA marked, Machinery Directive 2006/42/EC, supplied with a Certificate of Conformity |
| Warranty | 1 year |
Key Features
- Five sizes from 300 to 1200 litres
- Large side gate for a controlled pour
- Lever, hand wheel or hydraulic gate
- Works with a forklift or a crane
- Fork locking system
- Easy to clean out
Before You Order
Wet concrete weighs about 2.4 tonnes per cubic metre, so a full skip weighs close to its safe working load before you add the skip itself. Check your forklift or crane can lift both at the reach or height you need. If you'd like the hydraulic gate, tell us your machine and we'll confirm how it connects. Our guide on how to use a forklift concrete skip covers filling, pouring and washing out.
Under LOLER, lifting equipment needs regular thorough examination by a competent person, and lifting accessories need one at least every six months unless an examination scheme sets a different interval, so ask your examiner which applies to you. Then request a quote with the size and gate you want.
Related Attachments
Shovelling the mix out instead? See the steel mortar tray and the plastic mortar tub. On a telehandler, use the telehandler concrete skip. Compare all our concrete skips and mortar tubs, or browse everything on our forklift attachments page.
Request a quote
Tell us your forklift make and model, and your fork sizes if you have them, and we'll come back with a price, lead time and delivery cost.